
India
                        William Wootton
                        The Tidong River
Passos Maia hydropower plant
Passos Maia hydropower plant is located on the Chapecó river in the state of Santa Catarina.
- 
                        
                                
                
                
                            
                        2012Entered into operation
- 
                        
                                
                
                
                            
                        25 MWInstalled capacity
- 
                        
                                
                
                
                            
                        112 GWhAnnual production
The power plant has a total head of 83m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,415m long tunnel, 5.65m in diameter. The RCC dam is 22m high.

| Company | Ownership share | 
| Statkraft | 50% | 
| Adami S/A Madeiras | 50% |